Generally, first level distribution does not allow direct use of electrical equipment, and second level distribution will be by power equipment because it is three-phase electricity, while third level distribution is mains electricity (220V). Primary power distribution: The construction power distribution cabinet is specially designed for the special situation of the construction site. It is specially designed for the special situation of the project construction site and meets the relevant construction power specifications and standards of the. A distribution switchboard is the point at which an incoming-power supply divides into separate circuits, each of which is controlled and protected by the fuses or switchgear of the switchboard. Its job is to split an incoming electrical power feed into multiple secondary or subsidiary circuits. In. Summary of basic knowledge of power distribution box -- Classification of power distribution box Classification according to the requirements of power supply system: 1) Primary power distribution equipment is collectively referred to as power distribution center. They are centrally installed in the.
[PDF Version]